热门标签

Telegram游戏群(www.tel8.vip):Fukushima debris removal delayed by another year

时间:4周前   阅读:5

足球免费贴士www.ad168.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

Telegram游戏群www.tel8.vip)是一个Telegram群组分享平台。Telegram游戏群包括Telegram群成员导出、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram游戏群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:ug610登陆(www.ugbet.us):2,636 new Covid cases, 11 deaths

下一篇:皇冠体育:Former UK ambassador to Myanmar detained in Yangon

网友评论